
ISO 9001:2015
Quality management · Valid until Jan 2027

HomeCertificates
Independent proof of how we design, build and test. Previews are shown at reduced resolution; full copies are available to consultants and clients on request.
Integrated management system certified by Quality Registrar Systems for the design and assembly of LV switchgear.

Quality management · Valid until Jan 2027

Environmental management · Valid until Jan 2027

Occupational health and safety · Valid until Jan 2027
Design verification of our low-voltage switchgear and controlgear assemblies to IEC 61439-2, witnessed by independent laboratories.

Intertek ASTA · IEC 61439-2, BS EN 61439-2

65 kA for 3 s · IP43 · IEC 61439-2:2020

65 kA for 3 s · IP54 · IEC 61439-2:2020

65 kA for 3 s · IP54 · IEC 61439-2:2020
A licensed industrial manufacturer, registered with the Sharjah Economic Development Department for manufacturing electrical switchgear and power distribution control panels, registered with the UAE Ministry of Energy & Infrastructure, and approved by the Sharjah authorities below.

Grade 1 · Switchgear assembler and capacitor banks

First-category registered supplier · Electrical works

Registered supplier · Switchgear and control gear for Ministry projects
Accredited to build low-voltage switchboards with components from the world’s leading manufacturers.

Partner Panel Builder · Green level

Authorized Panel Builder · IEC 61439-1 & 2

Registered Panel Builder · xEnergy LV systems

Authorized LV Switchgear Panel Builder · UAE
Need a full copy for a submittal? Request documents
Before dispatch, every assembly goes through routine verification to IEC 61439-2 in our Sharjah factory and leaves with a signed factory test certificate. Consultants and contractors are welcome to witness the tests.
Parts list and drawings, IP rating, busbar and cable sizes, labels, shrouding of live parts, door earthing and tightness of connections.
Megger test at 1000 V DC between every phase, neutral and earth, before and after the dielectric test.
Power-frequency withstand test at 2.5 kV for 60 seconds on the main circuits.
Breakers, interlocks, control sequences, timers and indicators checked against the schematic, then signed off by our QA/QC engineer.
Every instrument is calibrated once a year by EIAC-accredited laboratories, AlphaTech (LB-CAL-023) and Accuver (LB-CAL-050), to ISO/IEC 17025:2017, with certificates traceable to international standards.
HIOKI · up to 1000 V DC
Measure insulation between every phase, neutral and earth, before and after the dielectric test.
2.5 / 5 kV AC
Applies the power-frequency withstand test that proves the insulation of the main circuits.
Up to 3000 A
Drives real current through breakers and busbars to check trip settings and connections.
0–10 A · 0–250 V
Tests protection relays and breaker trip units without high primary current.
150 A
Measures the resistance of busbar joints and contacts to confirm tight, low-loss connections.
0–150 A / 5 A
Confirms current transformers are wired the right way round, so meters and protection read correctly.
30 mA · 300 mA
Checks that residual-current devices trip within the required time.
1–3 Nm · 10–110 Nm
Torque wrenches and screwdrivers that tighten busbar and terminal connections to the manufacturer’s values.
Construction, layout, busbar sizes, insulator spacing, clearances and creepage, cable terminations, components and ratings, labels and the Emirate’s requirements. Then mechanical checks with torque marking and door interlocks, insulation at 1000 V, a 2.5 kV flash test for one minute, and function tests of meters, breakers, interlocks and earth-fault indication.
The same inspection and test sequence as an MDB, adapted to the board: construction, busbars, terminations, components and labels, mechanical checks, insulation and flash tests, then supply and function tests.
Ventilation, partitions between capacitors and contactors, discharge modules and fuses. The PF regulator is programmed to cos φ 0.94 with a 40 s step time, and fan direction, thermostat setting and manual mode are checked.
Everything checked on an MDB, plus VFD and soft starter programming, BMS signals, busbar extension provision, core-balance CT mounting and stainless steel hardware where sewage plants require it.
Visual and mechanical checks and an insulation test, then MCB, RCD, contactor and timer function tests, with every circuit label checked against the drawings.
Training
Our engineers and technicians are trained directly by the manufacturers whose components go into our panels.
How to assemble low voltage electrical switchboards: best practices. Four of our technicians hold Schneider Electric certificates of attendance.
XL PRO³ SC calculation and panel design software workshop, March 2022. Six of our engineers hold Legrand training certificates.
ACB installation, testing and programming with the Ekip T&P kit, March 2021. Eight of our team trained: engineers, a supervisor and technicians.
Send us your single-line diagram or specification. Our engineers will reply with a technical offer and lead time.