Inside a Sharjah switchgear factory

· 6 min read · Al Qudrah engineering team

The Al Qudrah team at the switchgear factory in Sharjah

Every LV panel we build follows the same path: engineering from the single-line diagram, approval by the consultant and authority, assembly to a verified design, routine testing, and dispatch with a signed test certificate. Al Qudrah Switchgear has run that process from its 1,500 m² factory in Emirates Industrial City (Al Sajaa), Sharjah, UAE since 2012. This is what happens at each stage.

Who we are

Al Qudrah Switchgear IND L.L.C. is an LV switchgear and control panel manufacturer founded in 2012 by Eng. Adnan Daboul. We build main distribution boards, SMDBs, DBs, capacitor banks, ATS and generator panels, and PLC, SCADA and DDC control panels.

The factory is at Shed No. 5, E611 Road, Emirates Industrial City. It holds ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018 certification, is licensed as an industrial manufacturer by the Sharjah Economic Development Department, and is a SEWA Certified Company, Grade 1, for switchgear assembly and capacitor bank components up to 3200 A. Our panels have gone to projects in the UAE, Saudi Arabia, Qatar, Bahrain, Oman, Jordan, Syria and Angola.

Stage 1: engineering

Engineering turns the consultant's single-line diagram and specification into drawings, a bill of materials and calculations ready for submittal. Most of a panel's quality is decided here, before any metal is touched.

Our engineers draw in EPLAN, which keeps the single-line diagram, schematics, terminal plans and label schedules linked to one model. For Legrand XL³ boards we use XL PRO³ for layout and heat dissipation; the team completed Legrand's XL PRO³ calculation and panel design training in 2022. Device selection follows the manufacturer's coordination and selectivity tables, and the board is checked against the limits of our IEC 61439-2 verified designs: up to 3200 A, 65 kA for 3 s with a 143 kA peak, verified at 50 °C ambient. Automation engineers write PLC, HMI and SCADA programs in house at the same stage.

The output is the submittal package. How we structure it is described in Switchgear submittals: what consultants expect.

Stage 2: approval and procurement

Nothing is built until the consultant, and where required the authority, has approved the drawings. Once approved, components are ordered to the approved bill of materials.

We build with Schneider Electric, Legrand, Eaton, CHINT, ABB and LS Electric components, and hold panel builder accreditation from Schneider (Green Partner Panel Builder, UAE), Legrand (Authorized Panel Builder, audited to IEC 61439-1 and -2), Eaton (Registered Panel Builder, xEnergy) and CHINT (Authorized LV Switchgear Panel Builder, UAE). Delivery is typically about two months after consultant and authority approval, depending on the order.

Stage 3: assembly

Assembly follows the verified switchboard system exactly: the same enclosure system, busbar arrangement, supports and torque values that were tested. That is what keeps each board inside its design verification.

Frames are assembled and the tinned copper busbar system is installed, sleeved and colour-coded. Devices are mounted and wired to the approved schematics. Busbar and power connections are tightened with calibrated torque tools and torque-marked. Barriers and shrouds are fitted to give the specified form of separation, from 2a to 4b, and the enclosure is finished to the specified IP rating, from IP43 to IP54.

Assembly methods follow manufacturer training our team has completed, including Schneider's "How to assemble LV switchboards: best practices" and ABB's Ekip T&P course on ACB installation, testing and programming (2021).

Stage 4: testing

Every panel is tested before dispatch, not a sample. The tests confirm it was built correctly to its verified design and works as the drawings say.

  • Visual and mechanical inspection, including torque marking.
  • Insulation resistance at 1000 V DC.
  • Dielectric (flash) test at 2.5 kV for one minute.
  • Function tests of control, interlock, metering and protection circuits.
  • Capacitor banks set to cos φ 0.94 with a 40 s step time, with 7% detuned reactors where harmonics require them.

We use 11 instruments calibrated by EIAC-accredited laboratories to ISO/IEC 17025, including HIOKI insulation testers, a 2.5/5 kV high-voltage test set, primary injection up to 3000 A, secondary injection, a 150 A millivolt-drop tester, a CT polarity tester, an RCD tester and torque tools. Consultants and contractors can witness the tests, and each panel leaves with a signed factory test certificate. The full process is in routine tests and witnessing a FAT.

What our customers say, and where our panels go

In our 2019 customer survey, 11 customers rated us across our service; 89% of ratings were Excellent and none were below Good. We would rather point to the work itself, though.

Projects include the Vida Dubai Mall heat pump master control panel, Masaar villas in Sharjah, Jouri Hills, Falcon Island in Ras Al Khaimah, Sheikh Khalifa Hospital in Umm Al Quwain, the University of Sharjah, the American University of Sharjah, Dubai Civil Defence stations, the Wafi hotel complex, Bank of Sharjah tower, Gulf Oasis Tower, 153 restaurant sites across the UAE, and in Saudi Arabia, King Salman Hospital and Riyadh Metro station 3E2. The full list is on our projects page, and our certificates are on the certificates page.

Frequently asked questions

Where is Al Qudrah's switchgear factory?

Our factory is at Shed No. 5, E611 Road, Emirates Industrial City (Al Sajaa), Sharjah, UAE. It covers 1,500 m² and houses engineering, assembly and testing. Consultants and contractors are welcome to visit and witness factory tests by arrangement. You can reach us on +971 6 536 0602 or info@qsgind.com.

What standards are Al Qudrah's panels built to?

Our switchboards are built to IEC 61439-1 and IEC 61439-2. Designs up to 3200 A are type-tested and design-verified by DEKRA and ASTA (Intertek), with short-circuit withstand of 65 kA for 3 s. The company is certified to ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018, and every panel passes routine tests before dispatch.

How long does it take to build an LV panel order?

Delivery is typically about two months after consultant and authority approval, depending on the size of the order and component availability. The approval stage depends on the consultant's and authority's review times, so a complete and consistent submittal is the best way to shorten the overall programme.

Which markets does Al Qudrah supply?

Al Qudrah supplies LV switchgear and control panels across the UAE and has delivered to Saudi Arabia, Qatar, Bahrain, Oman, Jordan, Syria and Angola. Saudi projects include King Salman Hospital and Riyadh Metro station 3E2. All panels are engineered, assembled and tested at our factory in Sharjah.